MB Group
MB Group is a renovation/alteration project at 5601 Democracy Drive Suite 150, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $450K across about 5,264 sq ft.
๐Project Metrics
TDLR #TABS2021000845Review Complete
Design review complete, construction may proceed
MB Group is a Renovation/Alteration project located at 5601 Democracy Drive Suite 150, Plano, TX 75204 in Plano, Texas. The project has an estimated value of $450K covering 5,264 sq ft. Parkwood Building Owner, LLC is the property owner and Interprise Design is the design firm of record. The project was registered with TDLR on September 16, 2020.
โFrequently Asked Questions
What is MB Group?
MB Group is a renovation/alteration project at 5601 Democracy Drive Suite 150 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing space
Is MB Group open in Plano?
MB Group is currently under construction in Plano, TX. Its current TDLR status is "Review Complete".
Where is MB Group located?
MB Group is located at 5601 Democracy Drive Suite 150, Plano, TX, 75204, in Collin County.
Who is the owner or developer of MB Group?
Parkwood Building Owner, LLC is the property owner/developer of record for MB Group, per its TDLR project registration.
Who is the architect or design firm for MB Group?
Interprise Design is the design firm of record for MB Group, according to its TDLR filing.
How much does MB Group cost and how big is it?
MB Group has an estimated construction value of $450K and approximately 5,264 square feet (about $85/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 16, 2020
Review Complete
Sep 16, 2020
Inspection Complete
Closed