New Polymer Production Line is a renovation/alteration project at 2400 N. Harvey Mitchell Parkway, Bryan, TX 77807, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2021). The project has an estimated value of $3.7M across about 4,960 sq ft.
Project has been completed and closed
New Polymer Production Line is a Renovation/Alteration project located at 2400 N. Harvey Mitchell Parkway, Bryan, TX 77807 in Bryan, Texas. The project has an estimated value of $3.7M covering 4,960 sq ft. Toyo Ink America, LLC is the property owner and Kajima Associates, Inc. is the design firm of record. The project was registered with TDLR on September 18, 2020.
New Polymer Production Line is a renovation/alteration project at 2400 N. Harvey Mitchell Parkway, Bryan, TX 77807 in Bryan, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of the installation of new Production Line in the existing 3 story Polymer Building.
Construction on New Polymer Production Line is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2021. The building is finished and very likely open.
New Polymer Production Line is located at 2400 N. Harvey Mitchell Parkway, Bryan, TX 77807, Bryan, TX, 77807, in Brazos County.
Toyo Ink America, LLC is the property owner/developer of record for New Polymer Production Line, per its TDLR project registration.
Kajima Associates, Inc. is the design firm of record for New Polymer Production Line, according to its TDLR filing.
New Polymer Production Line has an estimated construction value of $3.7M and approximately 4,960 square feet (about $746/sqft), based on its TDLR filing.
The project consists of the installation of new Production Line in the existing 3 story Polymer Building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 18, 2020
Review Complete
Inspection Complete
Closed
Jun 24, 2021