Ray Ban
Ray Ban is a renovation/alteration project at 1011 S Congress Ave. 2-F, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2021). The project has an estimated value of $125K across about 939 sq ft.
๐Project Metrics
TDLR #TABS2021002866Project Closed
Project has been completed and closed
Ray Ban is a Renovation/Alteration project located at 1011 S Congress Ave. 2-F, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $125K covering 939 sq ft. Music Lane Investors LLC is the property owner and PDMS Design Group is the design firm of record. The project was registered with TDLR on October 20, 2020.
โFrequently Asked Questions
What is Ray Ban?
Ray Ban is a renovation/alteration project at 1011 S Congress Ave. 2-F in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Build out of a retail tenant space for a new Ray Ban store
Is Ray Ban open in Austin?
Construction on Ray Ban is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2021. The building is finished and very likely open.
Where is Ray Ban located?
Ray Ban is located at 1011 S Congress Ave. 2-F, Austin, TX, 78704, in Travis County.
Who is the owner or developer of Ray Ban?
Music Lane Investors LLC is the property owner/developer of record for Ray Ban, per its TDLR project registration.
Who is the architect or design firm for Ray Ban?
PDMS Design Group is the design firm of record for Ray Ban, according to its TDLR filing.
How much does Ray Ban cost and how big is it?
Ray Ban has an estimated construction value of $125K and approximately 939 square feet (about $133/sqft), based on its TDLR filing.
๐Scope of Work
Build out of a retail tenant space for a new Ray Ban store
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 20, 2020
Review Complete
Inspection Complete
Closed
Jan 8, 2021
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Tenant finish-out with the installation of new non-structural partitions new millwork new light fixtures and new wall and ceiling finishes to create a new Uncommon James store.
Remodel Existing Retail Tenant Space
Home builders loop Ref: 2026-077261 BP Bluebonnet
Replacement of complete existing central heat and air system with or without duct work
Replace existing metering equipment with new transocket meter install 400 amp service disconnect remove 3 Federal Pacific disconnects and 2 Federal Pacific panels and consolidate loads into a single new distribution panel