UTSW NL7.120 Office -Lab Renovation is a renovation/alteration project at 6000 Harry Hines Blvd., Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2021). The project has an estimated value of $225K across about 1,200 sq ft.
Project has been completed and closed
UTSW NL7.120 Office -Lab Renovation is a Renovation/Alteration project located at 6000 Harry Hines Blvd., Dallas, TX 75235 in Dallas, Texas. The project has an estimated value of $225K covering 1,200 sq ft. Juan Guerra is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on December 1, 2020.
UTSW NL7.120 Office -Lab Renovation is a renovation/alteration project at 6000 Harry Hines Blvd. in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition of existing ceiling and flooring, existing doors to be reused. Addition of two walls to create tissue labs and office spaces.
Construction on UTSW NL7.120 Office -Lab Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2021. The building is finished and very likely open.
UTSW NL7.120 Office -Lab Renovation is located at 6000 Harry Hines Blvd., Dallas, TX, 75235, in Dallas County.
Juan Guerra is the property owner/developer of record for UTSW NL7.120 Office -Lab Renovation, per its TDLR project registration.
PBK Architects is the design firm of record for UTSW NL7.120 Office -Lab Renovation, according to its TDLR filing.
UTSW NL7.120 Office -Lab Renovation has an estimated construction value of $225K and approximately 1,200 square feet (about $188/sqft), based on its TDLR filing.
Demolition of existing ceiling and flooring, existing doors to be reused. Addition of two walls to create tissue labs and office spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 1, 2020
Review Complete
Inspection Complete
Closed
Jun 29, 2021