7-Eleven #41658 is a renovation/alteration project at 10803 Huffmeister Rd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $115K across about 3,127 sq ft.
Project has been completed and closed
7-Eleven #41658 is a Renovation/Alteration project located at 10803 Huffmeister Rd, Houston, TX 77065 in Houston, Texas. The project has an estimated value of $115K covering 3,127 sq ft. RACETRAC PETROLEUM INC is the property owner. The project was registered with TDLR on December 11, 2020.
7-Eleven #41658 is a renovation/alteration project at 10803 Huffmeister Rd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Store 41658 This project is a tenant "remodel" for an existing convenience store, at an existing tenant space, in an existing building. The scope of work includes relocating, replacing, and adding equipment.
Construction on 7-Eleven #41658 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
7-Eleven #41658 is located at 10803 Huffmeister Rd, Houston, TX, 77065, in Harris County.
RACETRAC PETROLEUM INC is the property owner/developer of record for 7-Eleven #41658, per its TDLR project registration.
7-Eleven #41658 has an estimated construction value of $115K and approximately 3,127 square feet (about $37/sqft), based on its TDLR filing.
Store 41658 This project is a tenant "remodel" for an existing convenience store, at an existing tenant space, in an existing building. The scope of work includes relocating, replacing, and adding equipment.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 11, 2020
Review Complete
Dec 11, 2020
Inspection Complete
Mar 21, 2026
Closed
Jun 17, 2026
1926d
Construction phase