Service Link
Service Link is a renovation/alteration project at 4600 Fuller Dr, Suite 400 Floor 4, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2021). The project has an estimated value of $499K across about 75,038 sq ft.
๐Project Metrics
TDLR #TABS2021006322Project Closed
Project has been completed and closed
Service Link is a Renovation/Alteration project located at 4600 Fuller Dr, Suite 400 Floor 4, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $499K covering 75,038 sq ft. Thompson Realty Capital, LLC is the property owner and Alliance Architects, Inc. is the design firm of record. The project was registered with TDLR on December 18, 2020.
โFrequently Asked Questions
What is Service Link?
Service Link is a renovation/alteration project at 4600 Fuller Dr, Suite 400 Floor 4 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of Existing Suite to accommodate a Subsidiary company of the current Tenant. - Renovation includes removing private offices to accommodate more open office space, training room and 3 large conference rooms
Is Service Link open in Irving?
Construction on Service Link is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2021. The building is finished and very likely open.
Where is Service Link located?
Service Link is located at 4600 Fuller Dr, Suite 400 Floor 4, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of Service Link?
Thompson Realty Capital, LLC is the property owner/developer of record for Service Link, per its TDLR project registration.
Who is the architect or design firm for Service Link?
Alliance Architects, Inc. is the design firm of record for Service Link, according to its TDLR filing.
How much does Service Link cost and how big is it?
Service Link has an estimated construction value of $499K and approximately 75,038 square feet (about $7/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of Existing Suite to accommodate a Subsidiary company of the current Tenant. - Renovation includes removing private offices to accommodate more open office space, training room and 3 large conference rooms
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 18, 2020
Review Complete
Inspection Complete
Closed
Feb 5, 2021