Starbucks Store
Starbucks Store is a renovation/alteration project at 1935 Medical District Drive, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2021). The project has an estimated value of $2.5M across about 8,000 sq ft.
๐Project Metrics
TDLR #TABS2021008196Project Closed
Project has been completed and closed
Starbucks Store is a Renovation/Alteration project located at 1935 Medical District Drive, Dallas, TX 75235 in Dallas, Texas. The project has an estimated value of $2.5M covering 8,000 sq ft. Children's Health System Texas is the property owner and EYP, Inc. is the design firm of record. The project was registered with TDLR on January 26, 2021.
โFrequently Asked Questions
What is Starbucks Store?
Starbucks Store is a renovation/alteration project at 1935 Medical District Drive in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Two story space infill, with build-out of first level of space and upper floor dedicated to shell space. Addition of a Mechanical Room.
Is Starbucks Store open in Dallas?
Construction on Starbucks Store is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2021. The building is finished and very likely open.
Where is Starbucks Store located?
Starbucks Store is located at 1935 Medical District Drive, Dallas, TX, 75235, in Dallas County.
Who is the owner or developer of Starbucks Store?
Children's Health System Texas is the property owner/developer of record for Starbucks Store, per its TDLR project registration.
Who is the architect or design firm for Starbucks Store?
EYP, Inc. is the design firm of record for Starbucks Store, according to its TDLR filing.
How much does Starbucks Store cost and how big is it?
Starbucks Store has an estimated construction value of $2.5M and approximately 8,000 square feet (about $313/sqft), based on its TDLR filing.
๐Scope of Work
Two story space infill, with build-out of first level of space and upper floor dedicated to shell space. Addition of a Mechanical Room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 26, 2021
Review Complete
Inspection Complete
Closed
Aug 19, 2021