HMH Dunn Tower Drop-Off
HMH Dunn Tower Drop-Off is a renovation/alteration project at 6565 Fannin St., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2022). The project has an estimated value of $2.0M across about 17,400 sq ft.
๐Project Metrics
TDLR #TABS2021012304Project Closed
Project has been completed and closed
HMH Dunn Tower Drop-Off is a Renovation/Alteration project located at 6565 Fannin St., Houston, TX 77030 in Houston, Texas. The project has an estimated value of $2.0M covering 17,400 sq ft. Houston Methodist Hospital is the property owner and EYP is the design firm of record. The project was registered with TDLR on March 30, 2021.
โFrequently Asked Questions
What is HMH Dunn Tower Drop-Off?
HMH Dunn Tower Drop-Off is a renovation/alteration project at 6565 Fannin St. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project scope includes cosmetic repairs to the Dunn Tower Drop-Off area.
Is HMH Dunn Tower Drop-Off open in Houston?
Construction on HMH Dunn Tower Drop-Off is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2022. The building is finished and very likely open.
Where is HMH Dunn Tower Drop-Off located?
HMH Dunn Tower Drop-Off is located at 6565 Fannin St., Houston, TX, 77030, in Harris County.
Who is the owner or developer of HMH Dunn Tower Drop-Off?
Houston Methodist Hospital is the property owner/developer of record for HMH Dunn Tower Drop-Off, per its TDLR project registration.
Who is the architect or design firm for HMH Dunn Tower Drop-Off?
EYP is the design firm of record for HMH Dunn Tower Drop-Off, according to its TDLR filing.
How much does HMH Dunn Tower Drop-Off cost and how big is it?
HMH Dunn Tower Drop-Off has an estimated construction value of $2.0M and approximately 17,400 square feet (about $115/sqft), based on its TDLR filing.
๐Scope of Work
The project scope includes cosmetic repairs to the Dunn Tower Drop-Off area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 30, 2021
Review Complete
Inspection Complete
Closed
Jan 10, 2022