Pinkies
Pinkies is a renovation/alteration project at 4101 Medical Park Drive Space 140, Odessa, in Ector County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2021). The project has an estimated value of $200K across about 2,750 sq ft.
๐Project Metrics
TDLR #TABS2021012414Project Closed
Project has been completed and closed
Pinkies is a Renovation/Alteration project located at 4101 Medical Park Drive Space 140, Odessa, TX 79765 in Odessa, Texas. The project has an estimated value of $200K covering 2,750 sq ft. Raja LLC is the property owner and NC Sturgeon is the design firm of record. The project was registered with TDLR on March 31, 2021.
โFrequently Asked Questions
What is Pinkies?
Pinkies is a renovation/alteration project at 4101 Medical Park Drive Space 140 in Odessa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out of existing shell
Is Pinkies open in Odessa?
Construction on Pinkies is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2021. The building is finished and very likely open.
Where is Pinkies located?
Pinkies is located at 4101 Medical Park Drive Space 140, Odessa, TX, 79765, in Ector County.
Who is the owner or developer of Pinkies?
Raja LLC is the property owner/developer of record for Pinkies, per its TDLR project registration.
Who is the architect or design firm for Pinkies?
NC Sturgeon is the design firm of record for Pinkies, according to its TDLR filing.
How much does Pinkies cost and how big is it?
Pinkies has an estimated construction value of $200K and approximately 2,750 square feet (about $73/sqft), based on its TDLR filing.
๐Scope of Work
Finish out of existing shell
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 31, 2021
Review Complete
Inspection Complete
Closed
Jul 15, 2021