Restore Cryotherapy Arboretum
๐Project Metrics
TDLR #TABS2021012463Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Interior buildout of an existing tenant space. Interior demolition, new walls, finishes, ductwork, plumbing, and new interior lighting and outlets. Adding exterior nitrogen tank in existing equipment/trash enclosure. New restrooms and ADA showers.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.7M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Upflow garage closet.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton greenspeed gas system
Replacing stolen wire service and installing meter 400A service on the load side of service disconnect was stolen. Wiring from this point load side of disco to tenant power electrical room was rewired with new wire. Nothing added or removed only wiring replaced for building electrical functio 3/O awg provided to match existing feeds and load.
Upgrade electrical service from 200 amp to 225 amp.
Temporary pole for service relocation/construction.