Spec Suite 940
Spec Suite 940 is a renovation/alteration project at 433 E. Las Colinas Suite 940, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $183K across about 1,819 sq ft.
๐Project Metrics
TDLR #TABS2021012860Review Complete
Design review complete, construction may proceed
Spec Suite 940 is a Renovation/Alteration project located at 433 E. Las Colinas Suite 940, Irving, TX 75039 in Irving, Texas. The project has an estimated value of $183K covering 1,819 sq ft. CBRE is the property owner and Entos is the design firm of record. The project was registered with TDLR on April 7, 2021.
โFrequently Asked Questions
What is Spec Suite 940?
Spec Suite 940 is a renovation/alteration project at 433 E. Las Colinas Suite 940 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of suite 940 to spec suite
Is Spec Suite 940 open in Irving?
Spec Suite 940 is currently under construction in Irving, TX. Its current TDLR status is "Review Complete".
Where is Spec Suite 940 located?
Spec Suite 940 is located at 433 E. Las Colinas Suite 940, Irving, TX, 75039, in Dallas County.
Who is the owner or developer of Spec Suite 940?
CBRE is the property owner/developer of record for Spec Suite 940, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 940?
Entos is the design firm of record for Spec Suite 940, according to its TDLR filing.
How much does Spec Suite 940 cost and how big is it?
Spec Suite 940 has an estimated construction value of $183K and approximately 1,819 square feet (about $101/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of suite 940 to spec suite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 7, 2021
Review Complete
Apr 7, 2021
Inspection Complete
Closed