Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations
📊Project Metrics
TDLR #TABS2021015497Project Closed
Project has been completed and closed
📋Scope of Work
Installation of a pedestrian hybrid beacon along with associated improvements, including; ramps, sidewalk, poles and foundations, conduit, crosswalk striping and signage, pedestrian and traffic signal heads and pushbuttons within existing ROW.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
🔗Related Projects
👤Same Owner
$46.1M total🏛️Same Design Firm
$5.3M total📄Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
foundation repair
partial de mo remove existing rear covered porch and add new temp wall. repair roof and flashing as needed
Total Demo of Detached Garage 240 Sqft Circa 1935
re-route sewer line in front yard