311 3rd Reno is a renovation/alteration project at 311 3rd Street, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2023). The project has an estimated value of $4.6M across about 20,000 sq ft.
Project has been completed and closed
311 3rd Reno is a Renovation/Alteration project located at 311 3rd Street, San Antonio, TX 78205 in San Antonio, Texas. The project has an estimated value of $4.6M covering 20,000 sq ft. David Lake is the property owner and Lake Flato is the design firm of record. The project was registered with TDLR on June 14, 2021.
311 3rd Reno is a renovation/alteration project at 311 3rd Street in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Primarily interior renovations at the existing 3-story office building along with repairs/maintenance of the existing facades and adjacent sidewalks. As well as includes the conversion of the adjacent 1-story garage into an enclosed courโฆ
Construction on 311 3rd Reno is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2023. The building is finished and very likely open.
311 3rd Reno is located at 311 3rd Street, San Antonio, TX, 78205, in Bexar County.
David Lake is the property owner/developer of record for 311 3rd Reno, per its TDLR project registration.
Lake Flato is the design firm of record for 311 3rd Reno, according to its TDLR filing.
311 3rd Reno has an estimated construction value of $4.6M and approximately 20,000 square feet (about $230/sqft), based on its TDLR filing.
Primarily interior renovations at the existing 3-story office building along with repairs/maintenance of the existing facades and adjacent sidewalks. As well as includes the conversion of the adjacent 1-story garage into an enclosed courtyard
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 14, 2021
Review Complete
Inspection Complete
Closed
Jan 20, 2023