Project has been completed and closed
20017 - Hyliion Operations Finishout is a Renovation/Alteration project located at 1202 BMC Drive, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $1.2M covering 41,600 sq ft. CBRE is the property owner and Noack Little Architects is the design firm of record. The project was registered with TDLR on June 24, 2021.
Interior finish-out of existing shell space and modification of a portion of existing suite area for vehicular electrification facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 24, 2021
Review Complete
Inspection Complete
Closed
Jul 1, 2024
Building permits found at or near this location
Replace metal staircase from the ground level up to 2nd and 3rd floor. Replace rotted wood around landings and paint.
2245ER NEW 2 STORY 4 BEDROOM 2 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
2245ER NEW 2 STORY 4 BEDROOM 2 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
we will replace the old split bus main panel that needs to be replaced because they are a known issue. We will upgrade the service to a 200 amp main breaker using 4/0 aluminum wire between the meter base and the panel. We will replace the meter base to meet Austin energy requirements. We will add in surge protection two ground rods and bond the gas line and waterline to the main panel to meet current code
Replacement of an existing water heater Replace Navien 210a2 Gas Tankless Water Heater Location: exterior wall mount backyard