The Ballroom is a renovation/alteration project at 412 Congress, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $50K across about 950 sq ft.
Design review complete, construction may proceed
The Ballroom is a Renovation/Alteration project located at 412 Congress, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $50K covering 950 sq ft. Michael Girard is the property owner and Merriman Pitt/Anderson, Inc. is the design firm of record. The project was registered with TDLR on June 29, 2021.
The Ballroom is a renovation/alteration project at 412 Congress in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to include addition of a rear fire exit stair, two restrooms with 6 fixtures each, and 13 total hand washing sinks. The project is approx. 950sf of impacted area.
The Ballroom is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
The Ballroom is located at 412 Congress, Austin, TX, 78701, in Travis County.
Michael Girard is the property owner/developer of record for The Ballroom, per its TDLR project registration.
Merriman Pitt/Anderson, Inc. is the design firm of record for The Ballroom, according to its TDLR filing.
The Ballroom has an estimated construction value of $50K and approximately 950 square feet (about $53/sqft), based on its TDLR filing.
Renovation to include addition of a rear fire exit stair, two restrooms with 6 fixtures each, and 13 total hand washing sinks. The project is approx. 950sf of impacted area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 29, 2021
Review Complete
Jun 29, 2021
Inspection Complete
Closed
Building permits found at or near this location
Foundation Repair Install 19 Steel Piers. (Building 20)
Removing and replacing windows like for like in existing residential home
Replacement of complete existing central heat and air system with or without duct work
2026/03/12 - 2026/03/16 | (2026/03/11 - 2026/03/17) | The project involves the temporary installation of window branding for an SXSW-related activation at the venue. The branding consists of adhesive vinyl graphics applied to exterior window surfaces as well as several removable elements including magnetic panels and one lightweight foam board (Forex/Phorex) panel. #SXSWAffiliated #TPWOnly (location: Speakeasy Austin) attaching branding to Speakeasy facade Some magnetic branding elements are secured using corresponding magnets placed on the interior side of the windows. No permanent fixtures or structural attachments will be made to the building faade. Installation Method: All installation and removal work will be carried out manually by a small production team using standard step ladders. No scissor lifts vehicles cranes or heavy machinery will be used. Right-of-Way Impact: Work will take place directly adjacent to the building faade along the sidewalk. Ladders and staff will temporarily occupy a small portion of the sidewalk directly in front of the windows during installation and removal. Pedestrian access will be maintained at all times. No street lanes parking spaces or bike lanes will be closed or impacted. Schedule Initial installation March 11 10:00 AM 6:00 PM Branding adjustment (lower windows switching to Berlin House imagery) March 14 8:00 10:00 AM Branding reset (switching back to German Haus branding) March 15 8:00 10:00 AM Removal of all branding March 17 8:00 AM 12:00 PM Traffic Control: A small temporary work zone will be established immediately adjacent to the building faade on the sidewalk. Step ladders will be used and monitored by staff at all times. Pedestrian access will remain open and safe passage will be maintained. No roadway parking or bike lane closures are required.
Replace gas water heater