Schenkel tower levels 06 and 11 is a renovation/alteration project at 1441 N. Beckley Avenue, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2022). The project has an estimated value of $4.5M across about 29,400 sq ft.
Project has been completed and closed
Schenkel tower levels 06 and 11 is a Renovation/Alteration project located at 1441 N. Beckley Avenue, Dallas, TX 75201 in Dallas, Texas. The project has an estimated value of $4.5M covering 29,400 sq ft. METHODIST HOSPITALS OF DALLAS is the property owner and Perkins&Will is the design firm of record. The project was registered with TDLR on July 7, 2021.
Schenkel tower levels 06 and 11 is a renovation/alteration project at 1441 N. Beckley Avenue in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor remodel scope, cosmetic upgrades throughout, some new accessible toilets
Construction on Schenkel tower levels 06 and 11 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2022. The building is finished and very likely open.
Schenkel tower levels 06 and 11 is located at 1441 N. Beckley Avenue, Dallas, TX, 75201, in Dallas County.
METHODIST HOSPITALS OF DALLAS is the property owner/developer of record for Schenkel tower levels 06 and 11, per its TDLR project registration.
Perkins&Will is the design firm of record for Schenkel tower levels 06 and 11, according to its TDLR filing.
Schenkel tower levels 06 and 11 has an estimated construction value of $4.5M and approximately 29,400 square feet (about $153/sqft), based on its TDLR filing.
Minor remodel scope, cosmetic upgrades throughout, some new accessible toilets
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 7, 2021
Review Complete
Inspection Complete
Closed
Mar 15, 2022