TWC Main Envelope Renovations is a renovation/alteration project at 101 East 15th St., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $2.3M across about 171,399 sq ft.
Design review complete, construction may proceed
TWC Main Envelope Renovations is a Renovation/Alteration project located at 101 East 15th St., Austin, TX 78778 in Austin, Texas. The project has an estimated value of $2.3M covering 171,399 sq ft. Texas Workforce Commission is the property owner and Elements of Architecture is the design firm of record. The project was registered with TDLR on July 14, 2021.
TWC Main Envelope Renovations is a renovation/alteration project at 101 East 15th St. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Window replacement, brick and sealant repairs, and the replacement of several exterior doors
TWC Main Envelope Renovations is still under construction in Austin, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
TWC Main Envelope Renovations is located at 101 East 15th St., Austin, TX, 78778, in Travis County.
Texas Workforce Commission is the property owner/developer of record for TWC Main Envelope Renovations, per its TDLR project registration.
Elements of Architecture is the design firm of record for TWC Main Envelope Renovations, according to its TDLR filing.
TWC Main Envelope Renovations has an estimated construction value of $2.3M and approximately 171,399 square feet (about $13/sqft), based on its TDLR filing.
Window replacement, brick and sealant repairs, and the replacement of several exterior doors
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 14, 2021
Review Complete
Jul 14, 2021
Inspection Complete
Closed
Building permits found at or near this location
Interior finish-out. SP-2022-0071C
Rack permit
Update the electrical meter and panel
Replacement of any self-contained packaged units 5 ton RTU change out like for like of RTU gas /package unit.
Interior Remodel Ground level - Kitchen remodel includes removal of some existing non-load bearing closet walls. Doorway cut into existing wall for proposed back kitchen all new appliances cabinetry lighting and plumbing fixtures. Moving plumbing locations. Primary bathroom remodel new shower tub relocated vanity sinks new entry door cut to master closet.