Neff Street
Neff Street is a renovation/alteration project at 499-401 Neff, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $468K across about 75,000 sq ft.
๐Project Metrics
TDLR #TABS2021020256Review Complete
Design review complete, construction may proceed
Neff Street is a Renovation/Alteration project located at 499-401 Neff, San Antonio, TX 78201 in San Antonio, Texas. The project has an estimated value of $468K covering 75,000 sq ft. City of San Antonio Public Works Department is the property owner and 6S-Engineering, Inc. is the design firm of record. The project was registered with TDLR on July 21, 2021.
โFrequently Asked Questions
What is Neff Street?
Neff Street is a renovation/alteration project at 499-401 Neff in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Street reconstruction. Construction of new 4' sidewalks on both sides of the street.
Is Neff Street open in San Antonio?
Neff Street is currently under construction in San Antonio, TX. Its current TDLR status is "Review Complete".
Where is Neff Street located?
Neff Street is located at 499-401 Neff, San Antonio, TX, 78201, in Bexar County.
Who is the owner or developer of Neff Street?
City of San Antonio Public Works Department is the property owner/developer of record for Neff Street, per its TDLR project registration.
Who is the architect or design firm for Neff Street?
6S-Engineering, Inc. is the design firm of record for Neff Street, according to its TDLR filing.
How much does Neff Street cost and how big is it?
Neff Street has an estimated construction value of $468K and approximately 75,000 square feet (about $6/sqft), based on its TDLR filing.
๐Scope of Work
Street reconstruction. Construction of new 4' sidewalks on both sides of the street.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 21, 2021
Review Complete
Jul 21, 2021
Inspection Complete
Closed