MCD1301
MCD1301 is a renovation/alteration project at 1300 S Beckam Ave, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2021). The project has an estimated value of $305K across about 2,225 sq ft.
๐Project Metrics
TDLR #TABS2021022428Project Closed
Project has been completed and closed
MCD1301 is a Renovation/Alteration project located at 1300 S Beckam Ave, Tyler, TX 75701 in Tyler, Texas. The project has an estimated value of $305K covering 2,225 sq ft. Lee Morris is the property owner and PM Design Group is the design firm of record. The project was registered with TDLR on August 19, 2021.
โFrequently Asked Questions
What is MCD1301?
MCD1301 is a renovation/alteration project at 1300 S Beckam Ave in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing McDonalds.
Is MCD1301 open in Tyler?
Construction on MCD1301 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2021. The building is finished and very likely open.
Where is MCD1301 located?
MCD1301 is located at 1300 S Beckam Ave, Tyler, TX, 75701, in Smith County.
Who is the owner or developer of MCD1301?
Lee Morris is the property owner/developer of record for MCD1301, per its TDLR project registration.
Who is the architect or design firm for MCD1301?
PM Design Group is the design firm of record for MCD1301, according to its TDLR filing.
How much does MCD1301 cost and how big is it?
MCD1301 has an estimated construction value of $305K and approximately 2,225 square feet (about $137/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of existing McDonalds.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 19, 2021
Review Complete
Inspection Complete
Closed
Oct 29, 2021