Integral Care is a renovation/alteration project at 6937 N. I-35, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2023). The project has an estimated value of $12.9M across about 70,000 sq ft.
๐Project Metrics
TDLR #TABS2021023153Project Closed
Project has been completed and closed
Integral Care is a Renovation/Alteration project located at 6937 N. I-35, Austin, TX 78752 in Austin, Texas. The project has an estimated value of $12.9M covering 70,000 sq ft. Integral Care is the property owner and STG Design is the design firm of record. The project was registered with TDLR on August 30, 2021.
โFrequently Asked Questions
What is Integral Care?
Integral Care is a renovation/alteration project at 6937 N. I-35 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Complete interior renovation and site modifications to 5 story commercial office building.
Is Integral Care open in Austin?
Construction on Integral Care is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2023. The building is finished and very likely open.
Where is Integral Care located?
Integral Care is located at 6937 N. I-35, Austin, TX, 78752, in Travis County.
Who is the owner or developer of Integral Care?
Integral Care is the property owner/developer of record for Integral Care, per its TDLR project registration.
Who is the architect or design firm for Integral Care?
STG Design is the design firm of record for Integral Care, according to its TDLR filing.
How much does Integral Care cost and how big is it?
Integral Care has an estimated construction value of $12.9M and approximately 70,000 square feet (about $185/sqft), based on its TDLR filing.
๐Scope of Work
Complete interior renovation and site modifications to 5 story commercial office building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 30, 2021
Review Complete
Inspection Complete
Closed
Jun 30, 2023
๐Related Projects
๐คSame Owner
$13.6M total๐๏ธSame Design Firm
$4.94B total๐Related City Permits
Building permits found at or near this location
QUICK TURNAROUND: Renovation of 4th level open office space within an existing office building.
QUICK TURNAROUND: Renovation of 4th level open office space within an existing office building.
QUICK TURNAROUND: Renovation of 2nd level open office space within an existing office building.
QUICK TURNAROUND: Renovation of 2nd level open office space within an existing office building.
CONSTRUCTION OF A NEW FENCE TO SECURE 28 EXISTING PARKING SPACES ON SITE. AVAILABLE TO EMPLOYESS ONLY AFTER 5PM. DURING NORMAL HOURS SECURED PARKING AREA TO REMAIN OPEN TO ALL.