Construction complete ยท Dec 2021๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

MEJ Office

8300 N Mopac Expy, Suite 225, Austin, TX 78759, Austin, TX, 78759

MEJ Office is a renovation/alteration project at 8300 N Mopac Expy, Suite 225, Austin, in Austin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $200K across about 4,374 sq ft.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2021023196
$200K
Project Value
4,374
Square Feet
$46/sqft
Cost/SqFt
3 months
Duration
Registered:Aug 30, 2021
Start:Oct 1, 2021
Target:Dec 31, 2021
๐Ÿ

Project Closed

Project has been completed and closed

MEJ Office is a Renovation/Alteration project located at 8300 N Mopac Expy, Suite 225, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $200K covering 4,374 sq ft. OAKPOINT TEXAS, LLC is the property owner. The project was registered with TDLR on August 30, 2021.

โ“Frequently Asked Questions

What is MEJ Office?

MEJ Office is a renovation/alteration project at 8300 N Mopac Expy, Suite 225 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing tenant space for office use. Minimal partition demolition with intention to reuse as much of existing building components as possible including ceiling, doors and lights. New frame/drywall, flooring, paint, millwork.

Is MEJ Office open in Austin?

Construction on MEJ Office is complete โ€” TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.

Where is MEJ Office located?

MEJ Office is located at 8300 N Mopac Expy, Suite 225, Austin, TX, 78759, in Austin County.

Who is the owner or developer of MEJ Office?

OAKPOINT TEXAS, LLC is the property owner/developer of record for MEJ Office, per its TDLR project registration.

How much does MEJ Office cost and how big is it?

MEJ Office has an estimated construction value of $200K and approximately 4,374 square feet (about $46/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Renovation of existing tenant space for office use. Minimal partition demolition with intention to reuse as much of existing building components as possible including ceiling, doors and lights. New frame/drywall, flooring, paint, millwork.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
August 30, 2021
Project Closed
December 31, 2021
Construction Start
October 1, 2021
Expected Completion
December 31, 2021

๐Ÿ“…Project Timeline

Filed

Aug 30, 2021

Review Complete

Inspection Complete

Closed

Dec 31, 2021

๐Ÿ“„Related City Permits

Building permits found at or near this location

8300 S 1ST ST

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

ActiveMechanical PermitChange OutJun 2026
View Details
2026-078725 MP
๐Ÿ”งRadiant Plumbing and Air Conditioning
8300 CAYUGA DR

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutJun 2026
View Details
2026-072347 MP
๐Ÿ”งMcCullough Heating & Air
8300 DIXON DR

EXPRESS: Foundation repair

ActiveBuilding PermitRepairMay 2026
$1
View Details
2026-056865 BP
๐Ÿ”งDouglas Foundation Repair
8300 SPICEWOOD SPRINGS CV

Addition of a rear patio cover - minor electrical

ActiveElectrical PermitAddition and RemodelApr 2026
View Details
2026-024991 EP
๐Ÿ”งPrimary Electrical Solutions L.L.C.
8300 SHENANDOAH DR

PROJECT SCOPE Provide one new dedicated AFCI/GFCI protected 20A 120V branch circuit from the main panel on the exterior wall of the house to a new kitchen range hood. No meter work being performed. INSTALLATION DETAILS Install a vertical 1-inch Steel EMT raceway exiting the main electrical panel from a 1-inch LR conduit body (located below all energized parts) on the homes exterior brick wall. Transition raceway to horizontal orientation for building penetration using a 1 LB. Penetrate into the accessible attic with 1 EMT terminating into a 4-11/16 steel junction box with a blank cover. Install #10-2 UF-B cable (1 HOT 1 NEUTRAL 1 EGC) (Sunlight Resistant/Wet Location rated) from the range hood to the steel junction box. Cable will be routed along ceiling rafters; any portion below 7 will be protected by guard strips per NEC 320.23. The #10-2 UF-B will be sleeved continuously from the 4-11/16 junction box through the LB down the vertical EMT and through the LR terminating directly into the main panel . This avoids all splices providing a continuous run from the OCPD to the appliance. CODE COMPLIANCE NOTES: 10 AWG conductors are specd. for this 20A circuit to account for ambient temperature correction in the unconditioned attic and sun-exposed exterior raceway. The EMT will be sealed with duct seal at the attic box and panel entry to prevent moisture migration and condensation per NEC 300.7. All cables and raceways will be supported/secured per NEC. All exterior fittings/hardware will be UL-listed rain-tight compression type. All cables and raceways will be supported and secured per NEC requirements. An insulated throat fitting or plastic bushing will be used at all EMT entry points to protect the cable jacket from abrasion. All wire terminations will be torqued to the manufacturer specifications per 2023 NEC 110.14(D)

ActiveElectrical PermitRepairApr 2026
View Details
2026-037859 EP
๐Ÿ”งOK Electric

Get alerts for Austin

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists