Wingstop
Wingstop is a renovation/alteration project at 5415 S Cooper St #113, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $175K across about 1,292 sq ft.
๐Project Metrics
TDLR #TABS2022000426Review Complete
Design review complete, construction may proceed
Wingstop is a Renovation/Alteration project located at 5415 S Cooper St #113, Arlington, TX 76017 in Arlington, Texas. The project has an estimated value of $175K covering 1,292 sq ft. CPG Cooper Oaks LP is the property owner and Harrison USA LLC is the design firm of record. The project was registered with TDLR on September 8, 2021.
โFrequently Asked Questions
What is Wingstop?
Wingstop is a renovation/alteration project at 5415 S Cooper St #113 in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Fit out of existing unit (remodel of existing Wingstop)
Is Wingstop open in Arlington?
Wingstop is currently under construction in Arlington, TX. Its current TDLR status is "Review Complete".
Where is Wingstop located?
Wingstop is located at 5415 S Cooper St #113, Arlington, TX, 76017, in Tarrant County.
Who is the owner or developer of Wingstop?
CPG Cooper Oaks LP is the property owner/developer of record for Wingstop, per its TDLR project registration.
Who is the architect or design firm for Wingstop?
Harrison USA LLC is the design firm of record for Wingstop, according to its TDLR filing.
How much does Wingstop cost and how big is it?
Wingstop has an estimated construction value of $175K and approximately 1,292 square feet (about $135/sqft), based on its TDLR filing.
๐Scope of Work
Fit out of existing unit (remodel of existing Wingstop)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 8, 2021
Review Complete
Sep 8, 2021
Inspection Complete
Closed