Herring Bank first floor Suite 110 is a renovation/alteration project at 2201 Civic Cir, Amarillo, in Potter County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $250K across about 3,000 sq ft.
Design review complete, construction may proceed
Herring Bank first floor Suite 110 is a Renovation/Alteration project located at 2201 Civic Cir, Amarillo, TX 79109 in Amarillo, Texas. The project has an estimated value of $250K covering 3,000 sq ft. Herring Bank is the property owner. The project was registered with TDLR on September 14, 2021.
Herring Bank first floor Suite 110 is a renovation/alteration project at 2201 Civic Cir in Amarillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove existing office cubicles. Install new partition walls. Update all electrical and data drops. Replace drop-in celling and install all new LED lights. All new floors millwork and finishes
Herring Bank first floor Suite 110 is currently under construction in Amarillo, TX. Its current TDLR status is "Review Complete".
Herring Bank first floor Suite 110 is located at 2201 Civic Cir, Amarillo, TX, 79109, in Potter County.
Herring Bank is the property owner/developer of record for Herring Bank first floor Suite 110, per its TDLR project registration.
Herring Bank first floor Suite 110 has an estimated construction value of $250K and approximately 3,000 square feet (about $83/sqft), based on its TDLR filing.
Remove existing office cubicles. Install new partition walls. Update all electrical and data drops. Replace drop-in celling and install all new LED lights. All new floors millwork and finishes
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 14, 2021
Review Complete
Sep 14, 2021
Inspection Complete
Closed