Crockett High School Renovations
๐Project Metrics
TDLR #TABS2022000912Project Closed
Project has been completed and closed
๐Scope of Work
Renovation to the Life Skills Classrooms; removal and replacement of millwork, replacement of residential appliances, painting, and other interior finishes. Replacement of aging mechanical, electrical, and plumbing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Rebuild service 200amp meter and panel
Replacement of complete existing central heat and air system with or without duct work
Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be installed at roof requires access to ceiling space ceiling tile replacement as required to access new roof drains.
Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be installed at roof requires access to ceiling space ceiling tile replacement as required to access new roof drains.
Replacement of an existing water heater Change Out: Install/ Replace 30 gallon electric tank-type water heater.