Southside Bank W. Frank Remodel is a renovation/alteration project at 2510 W. Frank Ave., Lufkin, in Angelina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2022). The project has an estimated value of $2.1M across about 15,756 sq ft.
Project has been completed and closed
Southside Bank W. Frank Remodel is a Renovation/Alteration project located at 2510 W. Frank Ave., Lufkin, TX 75904 in Lufkin, Texas. The project has an estimated value of $2.1M covering 15,756 sq ft. Jack Maines is the property owner and Blue Fin Design is the design firm of record. The project was registered with TDLR on September 20, 2021.
Southside Bank W. Frank Remodel is a renovation/alteration project at 2510 W. Frank Ave. in Lufkin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of an existing bank building and remodel of exterior drive-thru, entry, and ATM.
Construction on Southside Bank W. Frank Remodel is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2022. The building is finished and very likely open.
Southside Bank W. Frank Remodel is located at 2510 W. Frank Ave., Lufkin, TX, 75904, in Angelina County.
Jack Maines is the property owner/developer of record for Southside Bank W. Frank Remodel, per its TDLR project registration.
Blue Fin Design is the design firm of record for Southside Bank W. Frank Remodel, according to its TDLR filing.
Southside Bank W. Frank Remodel has an estimated construction value of $2.1M and approximately 15,756 square feet (about $133/sqft), based on its TDLR filing.
Interior remodel of an existing bank building and remodel of exterior drive-thru, entry, and ATM.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 20, 2021
Review Complete
Inspection Complete
Closed
Sep 14, 2022