GNC KK9381
GNC KK9381 is a renovation/alteration project at 4815 W. Braker Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2021). The project has an estimated value of $87K across about 1,200 sq ft.
๐Project Metrics
TDLR #TABS2022001998Project Closed
Project has been completed and closed
GNC KK9381 is a Renovation/Alteration project located at 4815 W. Braker Lane, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $87K covering 1,200 sq ft. REGENCY CENTERS LP is the property owner. The project was registered with TDLR on September 29, 2021.
โFrequently Asked Questions
What is GNC KK9381?
GNC KK9381 is a renovation/alteration project at 4815 W. Braker Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demo interior walls, doors, hardware, flooring and ceiling. Install new flooring, ceiling, toilet and toilet accessories.
Is GNC KK9381 open in Austin?
Construction on GNC KK9381 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2021. The building is finished and very likely open.
Where is GNC KK9381 located?
GNC KK9381 is located at 4815 W. Braker Lane, Austin, TX, 78759, in Travis County.
Who is the owner or developer of GNC KK9381?
REGENCY CENTERS LP is the property owner/developer of record for GNC KK9381, per its TDLR project registration.
How much does GNC KK9381 cost and how big is it?
GNC KK9381 has an estimated construction value of $87K and approximately 1,200 square feet (about $72/sqft), based on its TDLR filing.
๐Scope of Work
Demo interior walls, doors, hardware, flooring and ceiling. Install new flooring, ceiling, toilet and toilet accessories.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 29, 2021
Review Complete
Inspection Complete
Closed
Oct 29, 2021
๐Related Projects
๐คSame Owner
$42.5M total๐Related City Permits
Building permits found at or near this location
New construction- new sfr 1 story 4 bedrooms 2baths attached garage
New construction- new sfr 1 story 4 bedrooms 2baths attached garage
Meter and panel change out grounding gas meter Installing 2 ground rods and grounding the panel
Horizontal sewer repipe & horizontal water repipe. Partial plumbing repipe serving the front portion of the residence only. The existing sewer piping serving this portion of the home is cast iron and the existing water piping is galvanized steel. The scope of work includes replacement of the existing horizontal water and sewer piping serving the hall bathroom kitchen and laundry area along with replacement of associated vertical water risers as required to reconnect fixtures. Remove approximately 40 square feet of Sheetrock (8 x 5) behind the hall bathroom wall and approximately 50 square feet of Sheetrock (10 x 5) in the laundry room area to provide access for plumbing work. Install new outdoor tankless water heater at a new location. Run approximately 20 linear feet of new gas piping from the existing gas meter to the new tankless water heater location.
New construction- new sfr 1 story 4 bedrooms 2baths attached garage