Project has been completed and closed
PINTO PARCEL BLDG. 2 - US CABINET DEPOT EXPANSION is a Renovation/Alteration project located at 10484 GREENS CROSSING BOULEVARD, Houston, TX 77038 in Houston, Texas. The project has an estimated value of $289K covering 114,690 sq ft. Johnson Development Associates, Inc. is the property owner. The project was registered with TDLR on October 12, 2021.
PINTO PARCEL BLDG. 2 - US CABINET DEPOT EXPANSION is a renovation/alteration project at 10484 GREENS CROSSING BOULEVARD, Houston, TX 77038 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists on the expansion of existing tenant (US Cabinet Depot) to occupy the entire building. It includes 2 framed openings, battery charging station and future dock levelers and industrial fans.
Construction on PINTO PARCEL BLDG. 2 - US CABINET DEPOT EXPANSION is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2022. The building is finished and very likely open.
PINTO PARCEL BLDG. 2 - US CABINET DEPOT EXPANSION is located at 10484 GREENS CROSSING BOULEVARD, Houston, TX 77038, Houston, TX, 77038, in Harris County.
Johnson Development Associates, Inc. is the property owner/developer of record for PINTO PARCEL BLDG. 2 - US CABINET DEPOT EXPANSION, per its TDLR project registration.
PINTO PARCEL BLDG. 2 - US CABINET DEPOT EXPANSION has an estimated construction value of $289K and approximately 114,690 square feet (about $3/sqft), based on its TDLR filing.
Project consists on the expansion of existing tenant (US Cabinet Depot) to occupy the entire building. It includes 2 framed openings, battery charging station and future dock levelers and industrial fans.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 12, 2021
Review Complete
Inspection Complete
Closed
Oct 3, 2022