Avery Nelson Parkway
📊Project Metrics
TDLR #TABS2022003278Project Closed
Project has been completed and closed
📋Scope of Work
Construction of sidewalks and pedestrian ramps associated with the Avery Nelson Parkway roadway extension project
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Change Out: Install/ Replace 50 gallon electric tank-type water heater.
Change Out: 40 gallon natural gas tank-type with 199 K BTU tankless water heater
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [4 bed 3bath] with Attached 2-car garage.
cap off for water/wastewater Total Demo of SFR 904 sqft circa 1948
Total Demo of SFR 1244 sqft circa 1988 Total Demo of SFR 904 sqft circa 1948