David Harris
David Harris is a renovation/alteration project at 511 East John Carpenter Suite #380, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2022). The project has an estimated value of $85K across about 1,387 sq ft.
๐Project Metrics
TDLR #TABS2022003751Project Closed
Project has been completed and closed
David Harris is a Renovation/Alteration project located at 511 East John Carpenter Suite #380, Irving, TX 75062 in Irving, Texas. The project has an estimated value of $85K covering 1,387 sq ft. CP 511 BUILDING LLC is the property owner and idGROUP is the design firm of record. The project was registered with TDLR on October 22, 2021.
โFrequently Asked Questions
What is David Harris?
David Harris is a renovation/alteration project at 511 East John Carpenter Suite #380 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of this project is a non-structural interior finish-out in an existing single floor suite. Scope includes HVAC, electrical, and plumbing.
Is David Harris open in Irving?
Construction on David Harris is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2022. The building is finished and very likely open.
Where is David Harris located?
David Harris is located at 511 East John Carpenter Suite #380, Irving, TX, 75062, in Dallas County.
Who is the owner or developer of David Harris?
CP 511 BUILDING LLC is the property owner/developer of record for David Harris, per its TDLR project registration.
Who is the architect or design firm for David Harris?
idGROUP is the design firm of record for David Harris, according to its TDLR filing.
How much does David Harris cost and how big is it?
David Harris has an estimated construction value of $85K and approximately 1,387 square feet (about $61/sqft), based on its TDLR filing.
๐Scope of Work
The scope of this project is a non-structural interior finish-out in an existing single floor suite. Scope includes HVAC, electrical, and plumbing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 22, 2021
Review Complete
Inspection Complete
Closed
Apr 22, 2022