ABIA Existing Terminal Centralized Baggage Handling System Upgrades
๐Project Metrics
TDLR #TABS2022004627Review Complete
Design review complete, construction may proceed
๐Scope of Work
Renovation of 21,800sf of Level 1 to convert existing office space into a shell space for the expanded checked baggage inspection system; addition of 600sf new office space; 16,000sf of ceiling mod; installation of new baggage handling system
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
INSTALLATION OF 400A 277/480 VOLT 3PH 4W TEMP SERVICE @ 3600 1/2 BREAKTHROUGH LOOP AUSTIN TX 78754 APPROVED AE ESPA SIGNED BY BRIAN VAN DYKE 12/15/2025 Ref: 2024-151056 BP
Installation of Ramp Information Displays (RIDS) and Gate Information Displays (GIDS) for Southwest Airlines on the ramp level and holdrooms of gates 22 and 23. Exterior 2 locations 88 square feet; Interior 2 locations 18 square feet.
New construction of office/research SHELL (NOT FOR OCCUPANCY) EPLAN REVIEW
Installation of New Irrigation