SH 114 Sidewalk Improvements
SH 114 Sidewalk Improvements is a new construction project at 1800 E State Hwy 114 Briarwood Drive to Blessed Way, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $125K across about 10,940 sq ft.
๐Project Metrics
TDLR #TABS2022005505Project Closed
Project has been completed and closed
SH 114 Sidewalk Improvements is a New Construction project located at 1800 E State Hwy 114 Briarwood Drive to Blessed Way, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $125K covering 10,940 sq ft. City of Southlake is the property owner and Teague Nall & Perkins is the design firm of record. The project was registered with TDLR on November 17, 2021.
โFrequently Asked Questions
What is SH 114 Sidewalk Improvements?
SH 114 Sidewalk Improvements is a new construction project at 1800 E State Hwy 114 Briarwood Drive to Blessed Way in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of approximately 1130 LF of new 8-foot wide & 10-foot wide concrete sidewalk to provide continuous pathway connection.
Is SH 114 Sidewalk Improvements open in Southlake?
Construction on SH 114 Sidewalk Improvements is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.
Where is SH 114 Sidewalk Improvements located?
SH 114 Sidewalk Improvements is located at 1800 E State Hwy 114 Briarwood Drive to Blessed Way, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of SH 114 Sidewalk Improvements?
City of Southlake is the property owner/developer of record for SH 114 Sidewalk Improvements, per its TDLR project registration.
Who is the architect or design firm for SH 114 Sidewalk Improvements?
Teague Nall & Perkins is the design firm of record for SH 114 Sidewalk Improvements, according to its TDLR filing.
How much does SH 114 Sidewalk Improvements cost and how big is it?
SH 114 Sidewalk Improvements has an estimated construction value of $125K and approximately 10,940 square feet (about $11/sqft), based on its TDLR filing.
๐Scope of Work
The project consists of approximately 1130 LF of new 8-foot wide & 10-foot wide concrete sidewalk to provide continuous pathway connection.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 17, 2021
Review Complete
Inspection Complete
Closed
Dec 17, 2021
๐Related Projects
๐คSame Owner
$102.1M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Tarrant County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Tarrant County
Find General Contractors in Tarrant