Project has been completed and closed
709 Spring Street is a Renovation/Alteration project located at 709 Spring Street, Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $150K covering 3,500 sq ft. Baham Interests Group is the property owner and JSC4 is the design firm of record. The project was registered with TDLR on December 4, 2021.
709 Spring Street is a renovation/alteration project at 709 Spring Street, Bastrop, TX 78602 in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and replace exterior wall on storage building, add 2 ADA compliant bathrooms, install new HVAC, install upgraded electrical service, interior and exterior paint complete.
Construction on 709 Spring Street is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2022. The building is finished and very likely open.
709 Spring Street is located at 709 Spring Street, Bastrop, TX 78602, Bastrop, TX, 78602, in Bastrop County.
Baham Interests Group is the property owner/developer of record for 709 Spring Street, per its TDLR project registration.
JSC4 is the design firm of record for 709 Spring Street, according to its TDLR filing.
709 Spring Street has an estimated construction value of $150K and approximately 3,500 square feet (about $43/sqft), based on its TDLR filing.
Remove and replace exterior wall on storage building, add 2 ADA compliant bathrooms, install new HVAC, install upgraded electrical service, interior and exterior paint complete.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 4, 2021
Review Complete
Inspection Complete
Closed
Jan 31, 2022
Building permits found at or near this location
New pool and spa
*partial demo* New exterior stairs replace roof & rear deck interior remodel Notary to be confirmed
7 DAY repair and replace and deteriorated wood repaint. replace existing roof with new TPO roof. - OVA
Tunneling under the house to fix belly under slab estimate feet of tunnel is 15ft
Express: Foundation Repair