City of Calvert 2020 Texas CDBG DRP Walks
City of Calvert 2020 Texas CDBG DRP Walks is a renovation/alteration project at State Highway 6, Calvert, in Robertson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $450K across about 50,000 sq ft.
๐Project Metrics
TDLR #TABS2022008195Project Closed
Project has been completed and closed
City of Calvert 2020 Texas CDBG DRP Walks is a Renovation/Alteration project located at State Highway 6, Calvert, TX 77837 in Calvert, Texas. The project has an estimated value of $450K covering 50,000 sq ft. City of Calvert is the property owner and Bleyl Engineering is the design firm of record. The project was registered with TDLR on December 24, 2021.
โFrequently Asked Questions
What is City of Calvert 2020 Texas CDBG DRP Walks?
City of Calvert 2020 Texas CDBG DRP Walks is a renovation/alteration project at State Highway 6 in Calvert, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Repair sidewalks and paving along highway 6 between Gregg and Barton Streets
Is City of Calvert 2020 Texas CDBG DRP Walks open in Calvert?
Construction on City of Calvert 2020 Texas CDBG DRP Walks is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.
Where is City of Calvert 2020 Texas CDBG DRP Walks located?
City of Calvert 2020 Texas CDBG DRP Walks is located at State Highway 6, Calvert, TX, 77837, in Robertson County.
Who is the owner or developer of City of Calvert 2020 Texas CDBG DRP Walks?
City of Calvert is the property owner/developer of record for City of Calvert 2020 Texas CDBG DRP Walks, per its TDLR project registration.
Who is the architect or design firm for City of Calvert 2020 Texas CDBG DRP Walks?
Bleyl Engineering is the design firm of record for City of Calvert 2020 Texas CDBG DRP Walks, according to its TDLR filing.
How much does City of Calvert 2020 Texas CDBG DRP Walks cost and how big is it?
City of Calvert 2020 Texas CDBG DRP Walks has an estimated construction value of $450K and approximately 50,000 square feet (about $9/sqft), based on its TDLR filing.
๐Scope of Work
Repair sidewalks and paving along highway 6 between Gregg and Barton Streets
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 24, 2021
Review Complete
Inspection Complete
Closed
Jul 30, 2022