IAH GATE A20 MODIFICATIONS - PHASE 2
IAH GATE A20 MODIFICATIONS - PHASE 2 is a renovation/alteration project at 2800 N. Terminal Rd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2022). The project has an estimated value of $1.0M across about 1 sq ft.
๐Project Metrics
TDLR #TABS2022010155Project Closed
Project has been completed and closed
IAH GATE A20 MODIFICATIONS - PHASE 2 is a Renovation/Alteration project located at 2800 N. Terminal Rd, Houston, TX 77032 in Houston, Texas. The project has an estimated value of $1.0M covering 1 sq ft. HOUSTON AIRPORT SYSTEM (HAS) is the property owner. The project was registered with TDLR on January 26, 2022.
โFrequently Asked Questions
What is IAH GATE A20 MODIFICATIONS - PHASE 2?
IAH GATE A20 MODIFICATIONS - PHASE 2 is a renovation/alteration project at 2800 N. Terminal Rd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CURRENT GATE A20 UTILIZATION IS BY THE MEANS OF GROUND BOARDING THROUGH THE EXISTING SOUTH EXIT DOOR (STAIRWAY #9 ON PLANS) AND FOR ADA, PASSENGERS ARE ESCORTED BY THE HAS CREW VIA THE ELEVATOR IN THE CONCOURSE (ADJACENT TO STAIRWAY #8 Oโฆ
Is IAH GATE A20 MODIFICATIONS - PHASE 2 open in Houston?
Construction on IAH GATE A20 MODIFICATIONS - PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2022. The building is finished and very likely open.
Where is IAH GATE A20 MODIFICATIONS - PHASE 2 located?
IAH GATE A20 MODIFICATIONS - PHASE 2 is located at 2800 N. Terminal Rd, Houston, TX, 77032, in Harris County.
Who is the owner or developer of IAH GATE A20 MODIFICATIONS - PHASE 2?
HOUSTON AIRPORT SYSTEM (HAS) is the property owner/developer of record for IAH GATE A20 MODIFICATIONS - PHASE 2, per its TDLR project registration.
How much does IAH GATE A20 MODIFICATIONS - PHASE 2 cost and how big is it?
IAH GATE A20 MODIFICATIONS - PHASE 2 has an estimated construction value of $1.0M and approximately 1 square feet (about $1048.00K/sqft), based on its TDLR filing.
๐Scope of Work
CURRENT GATE A20 UTILIZATION IS BY THE MEANS OF GROUND BOARDING THROUGH THE EXISTING SOUTH EXIT DOOR (STAIRWAY #9 ON PLANS) AND FOR ADA, PASSENGERS ARE ESCORTED BY THE HAS CREW VIA THE ELEVATOR IN THE CONCOURSE (ADJACENT TO STAIRWAY #8 ON PLANS)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 26, 2022
Review Complete
Inspection Complete
Closed
Nov 16, 2022