Senza Maestro
๐Project Metrics
TDLR #TABS2022010420Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Remodel to existing 1 story 1,560 SF metal building into a new production and tasting room, and addition of 211 SF for new restrooms and fire riser.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$3.9M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater replacing an existing 40 gallon gas water heater like for like
Install Level 2 EV Charger
Installation of a 200A Service-Rated Automatic Transfer Switch 22kW whole home generator additional grounding and type 2 surge protection.
(Reason George) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Tis is a commercial shopping center one of the strips has a transformer that feeds a 36 x36 jbox with tap blocks inside. there are 6 meter banks that have feeder from the tap blocks to each meter then there respective disconnects. One of the A phase has melted insulation due to overload or deterioation of the insulation. This is an emergency requuest due to if the bare phase touches any metal parts and arc fault explosion can take place the likelyhood is high. Please approve this request high priority. I will have to coordinate with Autin Energy to do after hrs. Time sensitive. High danger.