Union Grove Food Hall
Union Grove Food Hall is a renovation/alteration project at 8100 Woodway Dr., Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2023). The project has an estimated value of $4.3M across about 28,954 sq ft.
๐Project Metrics
TDLR #TABS2022010448Project Closed
Project has been completed and closed
Union Grove Food Hall is a Renovation/Alteration project located at 8100 Woodway Dr., Waco, TX 76712 in Waco, Texas. The project has an estimated value of $4.3M covering 28,954 sq ft. 8100 Woodway LLC is the property owner and Sterling & Kap Architects is the design firm of record. The project was registered with TDLR on January 28, 2022.
โFrequently Asked Questions
What is Union Grove Food Hall?
Union Grove Food Hall is a renovation/alteration project at 8100 Woodway Dr. in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of two existing structures and an addition connecting them into a food hall.
Is Union Grove Food Hall open in Waco?
Construction on Union Grove Food Hall is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2023. The building is finished and very likely open.
Where is Union Grove Food Hall located?
Union Grove Food Hall is located at 8100 Woodway Dr., Waco, TX, 76712, in McLennan County.
Who is the owner or developer of Union Grove Food Hall?
8100 Woodway LLC is the property owner/developer of record for Union Grove Food Hall, per its TDLR project registration.
Who is the architect or design firm for Union Grove Food Hall?
Sterling & Kap Architects is the design firm of record for Union Grove Food Hall, according to its TDLR filing.
How much does Union Grove Food Hall cost and how big is it?
Union Grove Food Hall has an estimated construction value of $4.3M and approximately 28,954 square feet (about $149/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of two existing structures and an addition connecting them into a food hall.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 28, 2022
Review Complete
Inspection Complete
Closed
Jun 1, 2023