CAP PLN 11250_FY21-1 B2.4419 Removal of Equip
CAP PLN 11250_FY21-1 B2.4419 Removal of Equip is a renovation/alteration project at 1515 Holcombe, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $57K across about 475 sq ft.
๐Project Metrics
TDLR #TABS2022010881Project Closed
Project has been completed and closed
CAP PLN 11250_FY21-1 B2.4419 Removal of Equip is a Renovation/Alteration project located at 1515 Holcombe, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $57K covering 475 sq ft. MD Anderson Cancer Center is the property owner and Facilities Planning Design & Construction A/E Group is the design firm of record. The project was registered with TDLR on February 3, 2022.
โFrequently Asked Questions
What is CAP PLN 11250_FY21-1 B2.4419 Removal of Equip?
CAP PLN 11250_FY21-1 B2.4419 Removal of Equip is a renovation/alteration project at 1515 Holcombe in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope shall include infrastructure modifications as required to support the new x-ray blood irradiators in both temporary (B2.4423) and final locations (B2.4410a, B2.4419), removal of old security systems and pair of doors (B2.4419),โฆ
Is CAP PLN 11250_FY21-1 B2.4419 Removal of Equip open in Houston?
Construction on CAP PLN 11250_FY21-1 B2.4419 Removal of Equip is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is CAP PLN 11250_FY21-1 B2.4419 Removal of Equip located?
CAP PLN 11250_FY21-1 B2.4419 Removal of Equip is located at 1515 Holcombe, Houston, TX, 77030, in Harris County.
Who is the owner or developer of CAP PLN 11250_FY21-1 B2.4419 Removal of Equip?
MD Anderson Cancer Center is the property owner/developer of record for CAP PLN 11250_FY21-1 B2.4419 Removal of Equip, per its TDLR project registration.
Who is the architect or design firm for CAP PLN 11250_FY21-1 B2.4419 Removal of Equip?
Facilities Planning Design & Construction A/E Group is the design firm of record for CAP PLN 11250_FY21-1 B2.4419 Removal of Equip, according to its TDLR filing.
How much does CAP PLN 11250_FY21-1 B2.4419 Removal of Equip cost and how big is it?
CAP PLN 11250_FY21-1 B2.4419 Removal of Equip has an estimated construction value of $57K and approximately 475 square feet (about $120/sqft), based on its TDLR filing.
๐Scope of Work
The scope shall include infrastructure modifications as required to support the new x-ray blood irradiators in both temporary (B2.4423) and final locations (B2.4410a, B2.4419), removal of old security systems and pair of doors (B2.4419), and upgrades
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 3, 2022
Review Complete
Inspection Complete
Closed
May 10, 2024