Fatburger
Fatburger is a renovation/alteration project at 1521 Keller Parkway Suite 300, Keller, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $430K across about 2,481 sq ft.
๐Project Metrics
TDLR #TABS2022012429Review Complete
Design review complete, construction may proceed
Fatburger is a Renovation/Alteration project located at 1521 Keller Parkway Suite 300, Keller, TX 76248 in Keller, Texas. The project has an estimated value of $430K covering 2,481 sq ft. Greenway - Keller, L.P. is the property owner and Coeval Studio is the design firm of record. The project was registered with TDLR on February 23, 2022.
โFrequently Asked Questions
What is Fatburger?
Fatburger is a renovation/alteration project at 1521 Keller Parkway Suite 300 in Keller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Plumbing, grease trap, run electrical, gas, HVAC+duct work, wood fabrication, drywall, tiling
Is Fatburger open in Keller?
Fatburger is currently under construction in Keller, TX. Its current TDLR status is "Review Complete".
Where is Fatburger located?
Fatburger is located at 1521 Keller Parkway Suite 300, Keller, TX, 76248, in Tarrant County.
Who is the owner or developer of Fatburger?
Greenway - Keller, L.P. is the property owner/developer of record for Fatburger, per its TDLR project registration.
Who is the architect or design firm for Fatburger?
Coeval Studio is the design firm of record for Fatburger, according to its TDLR filing.
How much does Fatburger cost and how big is it?
Fatburger has an estimated construction value of $430K and approximately 2,481 square feet (about $173/sqft), based on its TDLR filing.
๐Scope of Work
Plumbing, grease trap, run electrical, gas, HVAC+duct work, wood fabrication, drywall, tiling
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 23, 2022
Review Complete
Feb 23, 2022
Inspection Complete
Closed