Walmart #5317-259
Walmart #5317-259 is a renovation/alteration project at 9300 S. Interstate 35, Ste. B, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $990K across about 52,500 sq ft.
๐Project Metrics
TDLR #TABS2022013073Review Complete
Design review complete, construction may proceed
Walmart #5317-259 is a Renovation/Alteration project located at 9300 S. Interstate 35, Ste. B, Austin, TX 78748 in Austin, Texas. The project has an estimated value of $990K covering 52,500 sq ft. Walmart R.E. Bus. Trust is the property owner and Cyntergy is the design firm of record. The project was registered with TDLR on March 2, 2022.
โFrequently Asked Questions
What is Walmart #5317-259?
Walmart #5317-259 is a renovation/alteration project at 9300 S. Interstate 35, Ste. B in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Cosmetic Remodel
Is Walmart #5317-259 open in Austin?
Walmart #5317-259 is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Walmart #5317-259 located?
Walmart #5317-259 is located at 9300 S. Interstate 35, Ste. B, Austin, TX, 78748, in Travis County.
Who is the owner or developer of Walmart #5317-259?
Walmart R.E. Bus. Trust is the property owner/developer of record for Walmart #5317-259, per its TDLR project registration.
Who is the architect or design firm for Walmart #5317-259?
Cyntergy is the design firm of record for Walmart #5317-259, according to its TDLR filing.
How much does Walmart #5317-259 cost and how big is it?
Walmart #5317-259 has an estimated construction value of $990K and approximately 52,500 square feet (about $19/sqft), based on its TDLR filing.
๐Scope of Work
Interior Cosmetic Remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 2, 2022
Review Complete
Mar 2, 2022
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$2.48B total๐Related City Permits
Building permits found at or near this location
Express: Replace windows
Addition of athletic lighting and electrical wiring at existing facilities.
Replace 3/4 backflow preventer
Replacement of complete existing central heat and air system with or without duct work AH AND COND CHANGE OUT
Replace Polaris blocks in wireway gutter at building #4 because existing connections are burnt-up. Per Hyatt this is a repair only.