Cuatro Ste a SK7 Investment Group Ste B is a additions to existing building project at 120 Riverwalk, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2022). The project has an estimated value of $75K across about 3,840 sq ft.
Project has been completed and closed
Cuatro Ste a SK7 Investment Group Ste B is a Additions to Existing Building project located at 120 Riverwalk, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $75K covering 3,840 sq ft. Robert McDonald is the property owner and Robert Judd is the design firm of record. The project was registered with TDLR on March 4, 2022.
Cuatro Ste a SK7 Investment Group Ste B is a additions to existing building project at 120 Riverwalk in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior finish out of shell building
Construction on Cuatro Ste a SK7 Investment Group Ste B is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2022. The building is finished and very likely open.
Cuatro Ste a SK7 Investment Group Ste B is located at 120 Riverwalk, San Marcos, TX, 78666, in Hays County.
Robert McDonald is the property owner/developer of record for Cuatro Ste a SK7 Investment Group Ste B, per its TDLR project registration.
Robert Judd is the design firm of record for Cuatro Ste a SK7 Investment Group Ste B, according to its TDLR filing.
Cuatro Ste a SK7 Investment Group Ste B has an estimated construction value of $75K and approximately 3,840 square feet (about $20/sqft), based on its TDLR filing.
interior finish out of shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 4, 2022
Review Complete
Inspection Complete
Closed
Oct 28, 2022
Building permits found at or near this location
41-60 Water Reroute ROADMAP: Water Reroute(41/60) Abandon the leaking water line & reroute it overhead in the attic. Includes insulating & strapping rerouted water line & hydrostatic testing of the entire system after repairs. 40 gallon water heater install.
Construct new driveway approach of 8 FT. No sidewalk inspection per plan review.
Abilene S402 C Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
New Service for SFR in ETJ. 2370 sq ft.
Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications