Rheum To Grow
Rheum To Grow is a renovation/alteration project at 2500 Fondren Suite 235, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $110K across about 1,510 sq ft.
๐Project Metrics
TDLR #TABS2022014947Project Closed
Project has been completed and closed
Rheum To Grow is a Renovation/Alteration project located at 2500 Fondren Suite 235, Houston, TX 77063 in Houston, Texas. The project has an estimated value of $110K covering 1,510 sq ft. Noex Management is the property owner and Harry Gendel Architects is the design firm of record. The project was registered with TDLR on March 25, 2022.
โFrequently Asked Questions
What is Rheum To Grow?
Rheum To Grow is a renovation/alteration project at 2500 Fondren Suite 235 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing space.
Is Rheum To Grow open in Houston?
Construction on Rheum To Grow is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.
Where is Rheum To Grow located?
Rheum To Grow is located at 2500 Fondren Suite 235, Houston, TX, 77063, in Harris County.
Who is the owner or developer of Rheum To Grow?
Noex Management is the property owner/developer of record for Rheum To Grow, per its TDLR project registration.
Who is the architect or design firm for Rheum To Grow?
Harry Gendel Architects is the design firm of record for Rheum To Grow, according to its TDLR filing.
How much does Rheum To Grow cost and how big is it?
Rheum To Grow has an estimated construction value of $110K and approximately 1,510 square feet (about $73/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 25, 2022
Review Complete
Inspection Complete
Closed
Aug 1, 2022