2205 Garver PH3
2205 Garver PH3 is a renovation/alteration project at 402 Harvey Mitchell Parkway, Suite 401, College Station, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $600K across about 9,910 sq ft.
๐Project Metrics
TDLR #TABS2022015845Project Closed
Project has been completed and closed
2205 Garver PH3 is a Renovation/Alteration project located at 402 Harvey Mitchell Parkway, Suite 401, College Station, TX 77861 in College Station, Texas. The project has an estimated value of $600K covering 9,910 sq ft. Sago Valley Park, LLC is the property owner. The project was registered with TDLR on April 5, 2022.
โFrequently Asked Questions
What is 2205 Garver PH3?
2205 Garver PH3 is a renovation/alteration project at 402 Harvey Mitchell Parkway, Suite 401 in College Station, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovations and expansion for Garver, LLC to include interior demolition, partition framing, drywall, painting, millwork, doors, and MEP systems.
Is 2205 Garver PH3 open in College Station?
Construction on 2205 Garver PH3 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.
Where is 2205 Garver PH3 located?
2205 Garver PH3 is located at 402 Harvey Mitchell Parkway, Suite 401, College Station, TX, 77861, in Brazos County.
Who is the owner or developer of 2205 Garver PH3?
Sago Valley Park, LLC is the property owner/developer of record for 2205 Garver PH3, per its TDLR project registration.
How much does 2205 Garver PH3 cost and how big is it?
2205 Garver PH3 has an estimated construction value of $600K and approximately 9,910 square feet (about $61/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovations and expansion for Garver, LLC to include interior demolition, partition framing, drywall, painting, millwork, doors, and MEP systems.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 5, 2022
Review Complete
Inspection Complete
Closed
Aug 29, 2022