Duncan College Room Renovations Floor 3 is a renovation/alteration project at 6100 Main Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $75K across about 1,337 sq ft.
Project has been completed and closed
Duncan College Room Renovations Floor 3 is a Renovation/Alteration project located at 6100 Main Street, Houston, TX 77005 in Houston, Texas. The project has an estimated value of $75K covering 1,337 sq ft. Rice University is the property owner and C Six Architecture LLC is the design firm of record. The project was registered with TDLR on April 6, 2022.
Duncan College Room Renovations Floor 3 is a renovation/alteration project at 6100 Main Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor Interior Renovation of Dormitory Apartment and Student Room
Construction on Duncan College Room Renovations Floor 3 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.
Duncan College Room Renovations Floor 3 is located at 6100 Main Street, Houston, TX, 77005, in Harris County.
Rice University is the property owner/developer of record for Duncan College Room Renovations Floor 3, per its TDLR project registration.
C Six Architecture LLC is the design firm of record for Duncan College Room Renovations Floor 3, according to its TDLR filing.
Duncan College Room Renovations Floor 3 has an estimated construction value of $75K and approximately 1,337 square feet (about $56/sqft), based on its TDLR filing.
Minor Interior Renovation of Dormitory Apartment and Student Room
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 6, 2022
Review Complete
Inspection Complete
Closed
Aug 26, 2022