๐Ÿ“‹Project Registered๐Ÿ—๏ธ New Construction๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

Exfluor Research Corp New Facility

1100 CO RD 236, Florence, TX 78664, Florence, TX, 78664
Pre-Construction15%

๐Ÿ“ŠProject Metrics

TDLR #TABS2022016144
$7.0M
Project Value
38,000
Square Feet
$184/sqft
Cost/SqFt
1y 1mo
Duration
Registered:Apr 8, 2022
Start:Jun 1, 2022
Target:Jun 30, 2023
๐Ÿ“‹

Project Registered

Project has been registered with TDLR and is in pre-construction phase

๐Ÿ“‹Scope of Work

New manufacturing facility with office

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
April 8, 2022
Construction Start
June 1, 2022
Expected Completion
June 30, 2023

๐Ÿ“Location & Views

Open in MapsGet Directions|30.79096, -97.90395

๐Ÿ“„Related City Permits

Building permits found at or near this location

11008 ROY BUTLER DR
21.47 mi away

Express: Replacing 7 windows (like for like)

ActiveBuilding PermitRepairFeb 2026
$1
View Details
2026-003722 BP
๐Ÿ”งRenewal by Andersen
11000 MIDDLE FISKVILLE RD BLDG B
31.74 mi away

Replace 2 Regulators and perform a Gas Pressure Test.

ActivePlumbing PermitRepairFeb 2026
View Details
2026-014974 PP
๐Ÿ”งClarke Kent Plumbing, Inc.
1100 S LAMAR BLVD
37.93 mi away

Mendocino Farms Install Internal illuminated channel letter

ActiveElectrical PermitAwningFeb 2026
View Details
2026-016347 EP
1100 S LAMAR BLVD
37.93 mi away

Mendocino Farms 1.2 South Elevation internal illuminated channel letters

ActiveElectrical PermitAwningFeb 2026
View Details
2026-016360 EP
11001 CAP STONE DR
41.24 mi away

Re-route three romex wires and an outlet in a 53 long section of nonstructural interior wall that is being moved 5 inches. A 42(H) x 54(W) section of sheetrock will be removed exposing the entire lengths of the wires that need rerouting. The existing wall is a 42 high nonstructural half-height wall made of two 2x4 frames parallel to one another and separated by approximately one inch of space (13.5 thick overall including sheetrock). The intent of the project is to remove the outer 2x4 frame reducing the thickness of the wall to only one 2x4 structure. The wires are routed through the outer frame so they need to be re-routed through the inner frame.

ActiveElectrical PermitRepairFeb 2026
View Details
2026-010937 EP

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists