PapaBubble
PapaBubble is a renovation/alteration project at 927 Studewood Street Suite 120, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $130K across about 1,000 sq ft.
๐Project Metrics
TDLR #TABS2022016609Review Complete
Design review complete, construction may proceed
PapaBubble is a Renovation/Alteration project located at 927 Studewood Street Suite 120, Houston, TX 77008 in Houston, Texas. The project has an estimated value of $130K covering 1,000 sq ft. REIS Associates is the property owner and Goree is the design firm of record. The project was registered with TDLR on April 13, 2022.
โFrequently Asked Questions
What is PapaBubble?
PapaBubble is a renovation/alteration project at 927 Studewood Street Suite 120 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Buildout of Interior space for Mercantile use
Is PapaBubble open in Houston?
PapaBubble is currently under construction in Houston, TX. Its current TDLR status is "Review Complete".
Where is PapaBubble located?
PapaBubble is located at 927 Studewood Street Suite 120, Houston, TX, 77008, in Harris County.
Who is the owner or developer of PapaBubble?
REIS Associates is the property owner/developer of record for PapaBubble, per its TDLR project registration.
Who is the architect or design firm for PapaBubble?
Goree is the design firm of record for PapaBubble, according to its TDLR filing.
How much does PapaBubble cost and how big is it?
PapaBubble has an estimated construction value of $130K and approximately 1,000 square feet (about $130/sqft), based on its TDLR filing.
๐Scope of Work
Buildout of Interior space for Mercantile use
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 13, 2022
Review Complete
Apr 13, 2022
Inspection Complete
Closed