EV Charging Stations - Norwood Park Plaza
๐Project Metrics
TDLR #TABS2022017357Review Complete
Design review complete, construction may proceed
๐Scope of Work
Installation of 4 electric vehicle charging stations, servicing 6 EV stalls, including new service from utility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$504K total๐Related City Permits
Building permits found at or near this location
New construction of 1 story SFR with 5 beds 2 baths attached garage covered porch and patio PUD Revision: Plan revision to change the house plan from an X35GM to a T35CN
Upgrade Single Phase 150A service to a 200A three phase service
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Horizontal Gas System (Downstairs) LIKE FOR LIKE: 2.5 Ton Horizontal Gas System (Upstairs) **TWO SYSTEM CHANGE OUT**
Express- Existing foundation repair as per scope of work attached
Express: Replace the hall bath toilet with an ADA height type replace the kitchen sink and faucet replace the hall bath sink vanity and faucet replace four existing smoke detectors to code.