Spyglass Point Suite 310
Spyglass Point Suite 310 is a renovation/alteration project at 1801 S MOPAC EXPY STE 310, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2022). The project has an estimated value of $400K across about 3,095 sq ft.
๐Project Metrics
TDLR #TABS2022017581Project Closed
Project has been completed and closed
Spyglass Point Suite 310 is a Renovation/Alteration project located at 1801 S MOPAC EXPY STE 310, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $400K covering 3,095 sq ft. 1801 S Mopac Ltd is the property owner and Group Two Architecture is the design firm of record. The project was registered with TDLR on April 26, 2022.
โFrequently Asked Questions
What is Spyglass Point Suite 310?
Spyglass Point Suite 310 is a renovation/alteration project at 1801 S MOPAC EXPY STE 310 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant interior finish out; office suite
Is Spyglass Point Suite 310 open in Austin?
Construction on Spyglass Point Suite 310 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2022. The building is finished and very likely open.
Where is Spyglass Point Suite 310 located?
Spyglass Point Suite 310 is located at 1801 S MOPAC EXPY STE 310, Austin, TX, 78746, in Travis County.
Who is the owner or developer of Spyglass Point Suite 310?
1801 S Mopac Ltd is the property owner/developer of record for Spyglass Point Suite 310, per its TDLR project registration.
Who is the architect or design firm for Spyglass Point Suite 310?
Group Two Architecture is the design firm of record for Spyglass Point Suite 310, according to its TDLR filing.
How much does Spyglass Point Suite 310 cost and how big is it?
Spyglass Point Suite 310 has an estimated construction value of $400K and approximately 3,095 square feet (about $129/sqft), based on its TDLR filing.
๐Scope of Work
tenant interior finish out; office suite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 26, 2022
Review Complete
Inspection Complete
Closed
Oct 1, 2022
๐Related Projects
๐๏ธSame Design Firm
$25.7M total๐Related City Permits
Building permits found at or near this location
Temporary Power for the Lake Travis Church of Christ NO BP [ETJ] [AE ]
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [1bed 1bath] with attached Garage. Unit B
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [3bed 3.5bath] with Autofill Pool. Unit A
Service upgrade
Install (1) UL listed DOLLAR TREE channel letter set on the North building elevation. Connect to existing electrical within 6 of the sign location.