Natera First Floor Remodel
Natera First Floor Remodel is a renovation/alteration project at 13011 McCallen Pass, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2023). The project has an estimated value of $7.0M across about 30,000 sq ft.
๐Project Metrics
TDLR #TABS2022018988Project Closed
Project has been completed and closed
Natera First Floor Remodel is a Renovation/Alteration project located at 13011 McCallen Pass, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $7.0M covering 30,000 sq ft. Natera is the property owner. The project was registered with TDLR on May 13, 2022.
โFrequently Asked Questions
What is Natera First Floor Remodel?
Natera First Floor Remodel is a renovation/alteration project at 13011 McCallen Pass in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial floor interior remodel of existing lab and conversion of office to lab, mech and elec pads and screens. Replacement of window with wall and duct.
Is Natera First Floor Remodel open in Austin?
Construction on Natera First Floor Remodel is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2023. The building is finished and very likely open.
Where is Natera First Floor Remodel located?
Natera First Floor Remodel is located at 13011 McCallen Pass, Austin, TX, 78753, in Travis County.
Who is the owner or developer of Natera First Floor Remodel?
Natera is the property owner/developer of record for Natera First Floor Remodel, per its TDLR project registration.
How much does Natera First Floor Remodel cost and how big is it?
Natera First Floor Remodel has an estimated construction value of $7.0M and approximately 30,000 square feet (about $233/sqft), based on its TDLR filing.
๐Scope of Work
Partial floor interior remodel of existing lab and conversion of office to lab, mech and elec pads and screens. Replacement of window with wall and duct.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 13, 2022
Review Complete
Inspection Complete
Closed
Jan 1, 2023
๐Related Projects
๐คSame Owner
$17.0M total๐Related City Permits
Building permits found at or near this location
QT - Install new 376.42 kWDC rooftop solar system to commercial only - OVA
QT - Install new 376.42 kWDC rooftop solar system to commercial only - OVA
Irrigation for lawn
New SFR ETJ sqft 2518
Add dumpster pad in existing enclosure