Najar
📊Project Metrics
TDLR #TABS2022019131Review Complete
Design review complete, construction may proceed
📋Scope of Work
New concrete foundation, wood frame, brick veneer structure on small narrow urban site, with all civil engineering required.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
service upgrade see attached ESPA and drawings 318 Congress & 318 Congress #B
2025/03/07 and 2025/03/08 (#SXSW) - VTProDesign will be producing a two-day experiential walkthrough at 318 East 5th St. The activation is anticipated to hold no more than 25 guests at a time for an approximately 10 minute experience. There will be no live music/performances or talking-heads/speakers. The experience is a walkthrough visual and environmental engagement based off of an upcoming TV series. Activation Dates: Load-in: 8:00am-11:59pm March 3rd - 6th 2025 Live: 11:00am-10:00pm March 7th-8th 2025 Load-out: 10:00pm-11:59pm March 8th-10th 2025
Disconnect/reconnect power to tie in PV/ESS components. We are not upgrading the size of the service not upgrading the meter size.
Install new 15.010kW rooftop solar system and 13.5kW energy storage system for existing residential only
Truss structure cladded in vinyl and polygal** outdoor occupant load 107 inside occupant load 141 office occupant load 14 total occupant load 262.