CP864782 CAM: ADA PATH OF TRAVEL (BRB/BUR/PAR)
๐Project Metrics
TDLR #TABS2022019167Project Closed
Project has been completed and closed
๐Scope of Work
BUR-Replace non-compliant door hdw., make lobby stair rails compliant. PAR- Demo E. side ent. ramp, add accessible ramp with compliant railings, int. stair rails. BRB-demo ext. stair rails, add new railings, new ADA accessible writing surface 1.116M.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.0M total๐๏ธSame Design Firm
$2.2M total๐Related City Permits
Building permits found at or near this location
Repair exterior damaged stone and sealants from vehicle damage.
Installation of walk in cooler and freezer. reference 2025-063900 BP
New inground Pool and concrete patio
New pool (autofill/heated)
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [5bed 3.5bath] with Attached Garage
๐Related Site Plans
City of Austin site plan approvals at this location